 |
| New kitchen with view to garden (with ladders) |
Well, it's the last few days before the Christmas holidays. I have to report sadly that the building project is NOT FINISHED yet.
The extension has been rendered (that means that the external plaster has been applied) and there is now a gas supply to my kitchen. The party wall, which is the boundary wall with my neighbour which forms the border to my courtyard, has also been finished and is now rendered. And the floor has been laid in the kitchen.
But there are still outstanding problems with many things. The main issue is a BIG LEAK in my new roof. There is a small gap in the seal of the rubber roof which means that the rain can enter. There is now a big damp patch on the new ceiling in the kitchen. The builders will have to return to fix the many problems which still exist.
 |
| Damp patch on the ceiling |
 |
| Bathroom with grey pain |
This week, the decorator painted the kitchen, bathroom and the passage way between the bathroom and the kitchen. Everything white, except for one wall in the kitchen, which is a very pale yellow. The colour in the bathroom is a very pale grey, which matches the light grey in the tiles in the bathroom. It looks great, especially when the sun shines in the new kitchen.
 |
| Sunny new kitchen and dining room |
 |
| Kitchen sink with window |
However, there is good news too. I will have a lodger from the beginning of January 2016. He is a young man who works for Lloyds Bank, in the Harbourside. He is also studying for his accountancy exams. I'm very happy to have him because I need the income. But the problem is that I have to move and rearrange everything!
This is the last blog of the year. Next instalment will be in January 2016. I hope I will be fully installed in my extension by then.
You sound v calm in the face of all these problems!
ReplyDeleteYou sound v calm in the face of all these problems!
ReplyDeleteThank you for your comment, Lindsay. I must say that I don't feel very calm now...
ReplyDelete