| New room with patio doors |
| Plaster drying |
The walls have been plastered and the floor has been built, with the underfloor heating laid on it. The underfloor heating works well, apparently. But we had some problems with the flooring and that is not yet down. But that's probably good, as the plaster needs to dry thoroughly before the engineered flooring is laid. However, the windows are still not in, and last week it rained. This rain was coming into the room, which is not good for the plaster which is supposed to be drying! The builders have now put some waterproof protection over the window spaces.
The bathroom is also plastered and the shower tray is in place. This week they will put in the toilet and basin, They will also tile the bathroom and the passage outside the bathroom.
| Bathroom, no toilet or basin yet |
When they have done that, it will be time for the kitchen to be fitted.
So I start to see the 'light at the end of the tunnel'... But there are still many things to do and which could go wrong. So I have to be patient.
I will be very, very relieved when it is finished. At least, when it is finished enough to start the decorating. Hopefully, it will be ready for decorating by end of November. Fingers crossed!
Please look at this link to my photo album with the latest photos from the project and PLEASE, leave a comment! I want to hear from you!! November photos of building project
| Underfloor heating, no flooring yet |